Cascade Bridge LLC of Vancouver, Washington drives piling with a Link-Belt 130-ton (117.9-mt) 228 HSL lattice crawler crane for a new $25.8 million crossing over existing Union Pacific and BNSF railroad tracks. The final bridge structure will be an 830 ft. (252.9 m) long, five span steel plate girder bridge with two travel lanes. “We […]
Cascade Bridge Selects 228 HSL for Overpass
